Ullage Profiles

Capacity 2007 2008 2009 2010 2011 2012 2013
Gas compression 15.5 Msm3/d red red orange red red orange orange

Ullage as % of system capacity  
<5% Red red
5% to 25% Amber amber
>25% Green green

The above ullage profile is for the 32" pipeline which runs south from the TP-1 bypass spool to the Frigg UK Terminal.  Pipeline/Terminal capacity is nominally 35 MMscm/d, but is dependent on pipeline operating conditions and the gas composition of inputting fields.

Ullage available is a function of the total bookings of the user fields contracted to the system plus potential fields where offers have been made for transportation.  Presently there is less than 5% ullage available in the system until Gas Year 2012 save for Gas Year 2009, however interruptible seasonal capacity may be available earlier. 

The 24” section runs from the Alwyn North Platform to the TP-1 bypass spool.  Available ullage is reported separately on the Alwyn Area page of this website.  Click here to access Alwyn Area.

Please note that we do not guarantee the accuracy of the information provided on this website and do not accept responsibility for any use you may make of the information. Although you are at liberty to download or print any information from this website, copyright remains with TOTAL E&P UK LTD at all times.