Process Diagram and Description

The capacity of the Frigg UK Terminal at St Fergus is:

  • nominally 35 MMscm/d (through three gas processing trains)
  • liquids production of 35 kbpd

Gas processing is by JT valves and/or turbo expander.  Liquids handling is by two de-ethaniser trains.

The gas trains are identical and designed for parallel operation. They feature the following operations:

  • liquids separation (inlet scrubber)
  • gas dehydration
  • NGL recovery
  • sales gas re-heating

The liquids trains are built for parallel operation, and feature the following operations:

  • liquid dehydration
  • de-ethanisation
  • associated off-gas compression

The pressure and temperature of the process facilities are a function of the operating mode.  This can be either high or low liquids production, depending on the prevailing economics.

The following diagram shows one of the three gas processing trains.

three gas processing trains

Please note that we do not guarantee the accuracy of the information provided on this website and do not accept responsibility for any use you may make of the information. Although you are at liberty to download or print any information from this website, copyright remains with TOTAL E&P UK LTD at all times.