UK.Total Advert
Frigg UK Pipeline
print page

Frigg UK Pipeline

Please click on the following links:


The gas will be redelivered from the St Fergus Gas Terminal to the National Grid Terminal for entry into the National Transmission System (NTS) in a condition to meet the NTS Specification, with the CO2 content in accordance with the specification applicable to the Frigg UK Terminal (currently 4% mol).


Please note that we do not guarantee the accuracy of the information provided on this website and do not accept responsibility for any use you may make of the information. Although you are at liberty to download or print any information from this website, copyright remains with TOTAL E&P UK LTD at all times.