UK.Total Advert
Elgin / Franklin Technical Specifications
print page

technical specifications

As the Elgin PUQ export infrastructure is operated by other parties, the entry and specifications for liquids and gas are based on standards negotiated with these Operators.  Further technical data on these systems is available through the infrastructure Operators as detailed below:

GAEL

Main Site

Technical Information

FPS

Main Site

Technical Information

SEAL

ICOP Information

 

Entry specifications for the Elgin PUQ will be negotiated as part of the technical inputs to the tie-in agreements.

Please note that we do not guarantee the accuracy of the information provided on this website and do not accept responsibility for any use you may make of the information. Although you are at liberty to download or print any information from this website, copyright remains with TOTAL E&P UK LTD at all times.